EXEMPLAIRE D’UN BUDGET DE LA CONSTRUCTION
1 | PERSONNELS | NOMBRE | P U | FREQUENCE | PT |
CHEF DU TRAVAUX | 1 | 200 | 6Mois | 1200 | |
CHEF MAGASINIEN | 1 | 150 | 6Mois | 900 | |
INGENIEUR | 1 | 300 | 6Mois | 1800 | |
LOGITITIEN | 1 | 130 | 6Mois | 780 | |
MAITRE MACONS | 3 | 250 | 6Mois | 450 | |
AIDE MACONS | 6 | 780 | 6Mois | 4680 | |
AUTRE PERSONNES D’EXECUTION | 5 | 650 | 6Mois | 3900 | |
CAMION ABENNE | 1 | 22000 | 6Mois | 22000 | |
CHAUFFEUR | 1 | 150 | 6Mois | 900 | |
CARBURANT | 20 | 619 | 6Mois | 3714.2 | |
2 | ADMINISTRATION | ||||
AUTORISATION DE BATIR : IMPO ET TAXE | 1 | 5210 | 1Mois | 5210 | |
3 | ACHAT DU TERRAIN | 1 | 500000 | 1Mois | 50 000 |
SOUS TOT | 95 534 ,2 | ||||
4 | IMPLATATION ET LONDRINE | ||||
FER A BETON/12 | 100 | 8,5 | 850 | ||
FER A BETON /6 | 50 | 4 | 200 | ||
FER A BETON /16 | 35 | 20 | 700 | ||
GRAVIER | 18m 3 | 15 | 270 | ||
SABLE | 18m3 | 17 | 306 | ||
CIMENT | 30 | 15 | 450 | ||
FILE A LIGATURER | 25kgs | 4 | 100 | ||
SOUS TOT | 2 876 | ||||
5 | ELEVATION DE MUR | ||||
BRIC | 30 000 | 0,058 | 1 750 | ||
SABLE | 30m3 | 17 | 510 | ||
SIMENT | 50Sac | 15 | 750 | ||
PLACHE | 60 | 5 | 300 | ||
SOUS TOT | 3 310 | ||||
6 | COFRAGE ET FERREAGE DE DALE | ||||
PLANCHETTE | 100 | 5 | 500 | ||
DRIE | 100 | 4 | 200 | ||
CLUE | 100kg | 2,5 | 250 | ||
FER A BETON/12 | 100 | 8,5 | 850 | ||
FER A BETON/6 | 50 | 4 | 200 | ||
FIL A LIGATURER | 30kg | 4 | 120 | ||
GRAVIER | 24m3 | 15 | 360 | ||
SABLE | 48m3 | 17 | 816 | ||
CIMENT | 120 | 15 | 1 800 | ||
SOUS TOT | 4 996 | ||||
7 | INSTALATION ELECTRIQUE ET PLOMBERIE | ||||
AMPOULE | 30PS | 3 | 90 | ||
PVS 1/2 | 50PS | 3 | 150 | ||
PRISE | 14 | 2 | 28 | ||
SOKER | 30 | 2 | 60 | ||
INTERBUTEUR | 14 | 2 | 28 | ||
BOITE ELL | 100PS | 2 | 200 | ||
BOUT DE TEC | 2PS | 5 | 10 | ||
BOUT DE ER | 12PS | 3 | 36 | ||
FIL ELECTRIQUE | 5R | 25 | 125 | ||
ATACHE | 5BOIT | 2.5 | 12.5 | ||
TOILE ISOLANTE | 5PS | 2 | 10 | ||
PVS 110 | 5 | 15 | 75 | ||
PVS 43 | 6 | 12 | 72 | ||
QV DE TOILETTE | 5 | 15 | 75 | ||
SOUS TOT | 1 119 | ||||
8 | ELEVATION DE MUR EN ETTAGE | ||||
BRIQUE | 10 000 | 0.058 | 580 | ||
CIMENT | 40 | 15 | 600 | ||
FER A BETON/12 | 50 | 8.5 | 425 | ||
FER A BETON/6 | 40 | 4 | 160 | ||
SABLE | 18m 3 | 17 | 306 | ||
FIL A LIGATURER | 5kg | 4 | 20 | ||
SOUS TOT | 2 091 | ||||
9 | CHARPANTE | ||||
TB 60×40 | 80 | 16.5 | 1280 | ||
TB 40×40 | 80 | 8 | 640 | ||
TOLE | 160 | 15 | 2400 | ||
BOULOT | 5BT | 100 | 500 | ||
GOUTIER | 18 | 10 | 180 | ||
PVS 90 | 8 | 14 | 112 | ||
ATACHE | 100 | 2 | 200 | ||
SOUS TOT | 5 312 | ||||
10 | FOCE EPTIQUE | ||||
BRIC | 3 000 | 0.058 | 174 | ||
SABLE | 3m3 | 17 | 51 | ||
CIMENT | 6 | 15 | 90 | ||
FER A BETON/12 | 6 | 8,5 | 42,5 | ||
FIL A LIGATURE | 2kg | 4 | 8 | ||
PVS | 1 | 15 | 15 | ||
CREATION | 12m | 8 | 96 | ||
CREATION | 6m | 8 | 48 | ||
PIERRE | 6m2 | 15 | 90 | ||
SOUS TOT | 614 ,5 | ||||
11 | FINISSAGE | ||||
CIMENT | 200 | 15 | 3 000 | ||
SABLE | 50m3 | 17 | 850 | ||
CAREAU | 55CART50/4 | 25 | 1 375 | ||
CAREAU | 50CART 30/20 | 20 | 1000 | ||
PORTE METALIQUE | 5 | 200 | 1000 | ||
PORTE EN BOIT | 10 | 100 | 1000 | ||
FENETRE METALIQUE | 30 | 100 | 3 000 | ||
FENETRE EN BOIT | 13 | 50 | 650 | ||
PENTURE | 40 | 45 | 1800 | ||
PEINTRE | 4 | 100 | 400 | ||
VITRES | 100 | 10 | 1000 | ||
SOUS TOT | 12 195 | ||||
TOT GENERAL | TOTAL | 128 047.7 |